EEC/07/348/HQ
North Devon Highways and Traffic Orders Committee
11 December 2007
Devon Local Transport Plan - Scheme for Formal Approval
Station Road, Ilfracombe to Lee Bridge, Mortehoe Cycleway Upgrade
Report of the Area Engineer (North)
Please note that the following recommendations are subject to consideration and determination by the Committee before taking effect. |
Recommendations: It is recommended that:
(a) the scheme shown on drawing no. MAIN(N)626/0 for the upgrading of the existing National Cycle Network Route 27 from Station Road, Ilfracombe to Lee Bridge, Mortehoe to a surfaced to a width of two and a half metres wide shared use pedestrian and cycle route is approved;
(b) the route be surfaced as detailed in drawing no WOEC/4 with an estimated cost of 46,000 including design and supervision.
1. Summary
This report seeks approval to the upgrading of the existing cycleway which is part of the National Cycleway Network.
2. Introduction
This cycleway is part on the National Cycle Network Route 27, Ilfracombe to Plymouth coast to coast route. The section under consideration runs along the part of the former Barnstaple to Ilfracombe railway line.
3. Current Situation
This route provides a link between the urban settlement of Ilfracombe to the coastal villages of Woolacombe and Mortehoe. The cycleway is subject to standing water and vegetation encroaching onto the surface which is hard to manage.
4. Proposals
It is proposed to use surface dressing over recycled road planings to provide a two and a half metre wide firm surface on the line of the existing cycleway. Surface water will be directed away from the surface. This design has been used extensively on the upgrading of the Tarka Trail from Braunton to Bideford.
5. Financial Considerations
The estimated cost of the scheme is 46,000. It is proposed that the scheme is to be funded through the local access improvement element of the Towns, Villages and Rural Communities Programme.
6. Alternative Options Considered
The option of resurfacing the cycleway in normal surfacing materials would not be viable due to the amount of additional works that would be required which would increase the cost. In addition this method of construction is in keeping with the other cycleways in the locality.
7. Reasons for Reaching the Recommendation
A number of complaints have been received at the Area Engineer (North) office on the condition of the surface. This option will prove the most economical to provide a suitable surface.
8. Sustainability Considerations
The use of road planings from resurfacing schemes in North Devon will ensure the material is recycled rather than going to landfill. On completion of these works the maintenance of the surface and gaining access for the maintenance of the vegetation the will be greatly improved.
The improvement will make it more attractive to walkers and cyclists encouraging an increase in leisure and commuter usage between the market town of Ilfracombe and the holiday villages of Mortehoe and Woolacombe.
9. Legal Considerations
None.
10. Equality Considerations
The improvement of the surface of the trail will improve accessibility to all users.
Joe Deasy
Electoral Divisions: Ilfracombe and Combe Martin Rural
Local Government Act 1972
List of Background Papers
Contact for enquiries: Joe Deasy
Room No: Barnstaple Civic Centre
Tel No: 01271 382727